InfraX

Minor bridge substructure

Trade
Bridge work
Location
Haridwar, Uttarakhand
Budget
₹2.0 – 2.6 Cr
Start
Within 30 days

Substructure for a two-lane minor bridge — piles or open foundation as per drawing, pier caps and abutments. River-season constraints apply; start window is after the current monsoon residual flow drops.